Grabs for dowels

Lifting concrete tunnel lining segments systems.

: Grabs
Grabs for dowels
Scroll
Grabs for dowels

Grabs without rotation ready to specially manipulate up to four tunnel lining segments at the time, indispensable for big execution works, such as metro lines and public work in general. Opcionally, the tongs for lifting tunnel concrete segments can be commanded through the own remote control of the crane. We take care of our client's suggestions and  make tailor-made projects.

Our tong also has frequency variators, PLC and a communications system that allows to our after sales department (via GSM) to adjust remotely parameters in minor incidents. Motorman incorporates in all concrete tunnel lining segments grabs  a security system designed with load detection sensors to avoid the arms opening . They also have light signs to indicate the status of the load. 

Optional features: Weighing system, inclinometer, closure to zero within arms, computer equipments transmission via RS232, WIFI or Profibus, display load's transmission  to a crane, PC...

 

Technical characteristics

  • Capacity and dimensions tailor made to fulfill client's requirements.
  • Safety sensors for detecting the load and avoid wrong opening of the arms.
  • Opening through motor-reductor and chain.
  • Power supply 380V III.
  • Manufactured under norms FEM Ed 1987-54 (clase A7 M8) equivalent to DIN H3/B5.

Options

  • Motorized rotation

ADDRESS:Beat Oriol, 1. P1-1B. 08110 Montcada i Reixac - Barcelona

SKYPE:motorman.sales

TELEPHONE:Tel: +34 93 575 33 66
Fax: +34 93 564 86 00